GET IN TOUCH +44 (0)370 850 0858

Power Electrics Generators - Containagen

CONTAINAGEN - Containerised Generators

Containagen is a secure power solution built with you in mind. Power Electrics will help you select the right generator size, fuel tank and ancillaries for your project and then install them in a lockable, heavy duty ISO container as part of a power package. 

SAFE & SECURE CONTAINERISED GENERATORS

Containerised generators offer a power solution for your security and environmental challenges. Containagen units come complete with a bunded fuel tank, are emissions compliant, ultra quiet (rated 70dBA @1m) and fully lockable. These containerised generators are available to hire or buy. Optional extras include hazardous area packs, chalwyn valves, spark arrestors and synchronising packs.

Make an enquiry

Power Electrics - Containerised Generators
Fully lockable
High security lock with anti-tamper cover to increase security and durability.

XL FUEL TANK     
1500L bulk fuel tank for extended running time.
Bunded floor tank
110% capacity bund to fully contain any fluid spillage.

Acoustically Optimised
Reduced noise levels (70 dBA @1m)

A POWER SOLUTION FOR YOUR SECURITY & ENVIRONMENTAL CHALLENGES

 
     GENERATOR SIZE     |       CONTAINER SIZE    |       MAX. WEIGHT     |      FUEL CAPACITY     
20 - 110kVA  10ft ISO  5000kg 1500L
150 - 200kVA  12ft ISO  6500kg 1500L

 

Quick Quote

Please tell us a bit about the generator you would like to hire


Sign up to receive our newsletter and special offer emails. You can unsubscribe at any time via the link in our emails. All emails are from Power Electrics. We promise we will not sell or give away your email address to any third parties. For more details on how we use your information, please see our Privacy Policy.
 

* fields are required


Wind turbine paint workshop

Jan 31, 2019, 15:14 PM

Providing power to a wind turbine paint workshop

A decommissioned power station in the UK has been given a new lease of life in generating power. A manufacturer of wind turbines has chosen the site for a blade painting and storage facility. The 80-metre wind turbine blades are sent by barge from the manufacturing plant to be treated before being transported to site. Power Electrics was asked to provide temporary power for the workshop where the blades were prepped, sprayed and cured.

The Challenge:

The site required a 500kVA supply to operate the paint workshop. Reliable and uninterruptible power was critical within this project – any loss of power during the spraying and curing process would mean starting over again.

The Solution:

Power Electrics has provided 2 x 500kVA generators, both have been configured for N+1 operation via the ComAp control panels. This means that both sets run at the same time, if one set should fail, there will still be ample power from the other and there’ll be no break to the supply. In addition to the two generators, a distribution panel, telemetry and fuel management service was needed to ensure the smooth running of the operation.

IMG_20180913_120421

Power Electrics’ Andy Wakefield said “With projects like this, having an uninterrupted source of power is critical. The two 500kVA generators, in a redundancy configuration, made sure the client received a reliable supply of power”.

WANT TO DISCUSS YOUR PROJECT? PLEASE CALL +44 (0)370 850 0858