GET IN TOUCH +44 (0)370 850 0858

Power Electrics Generators - Containagen

CONTAINAGEN - Containerised Generators

Containagen is a secure power solution built with you in mind. Power Electrics will help you select the right generator size, fuel tank and ancillaries for your project and then install them in a lockable, heavy duty ISO container as part of a power package. 

SAFE & SECURE CONTAINERISED GENERATORS

Containerised generators offer a power solution for your security and environmental challenges. Containagen units come complete with a bunded fuel tank, are emissions compliant, ultra quiet (rated 70dBA @1m) and fully lockable. These containerised generators are available to hire or buy. Optional extras include hazardous area packs, chalwyn valves, spark arrestors and synchronising packs.

Make an enquiry

Power Electrics - Containerised Generators
Fully lockable
High security lock with anti-tamper cover to increase security and durability.

XL FUEL TANK     
1500L bulk fuel tank for extended running time.
Bunded floor tank
110% capacity bund to fully contain any fluid spillage.

Acoustically Optimised
Reduced noise levels (70 dBA @1m)

A POWER SOLUTION FOR YOUR SECURITY & ENVIRONMENTAL CHALLENGES

 
     GENERATOR SIZE     |       CONTAINER SIZE    |       MAX. WEIGHT     |      FUEL CAPACITY     
20 - 110kVA  10ft ISO  5000kg 1500L
150 - 200kVA  12ft ISO  6500kg 1500L

 

Quick Quote

Please tell us a bit about the generator you would like to hire


Sign up to receive our newsletter and special offer emails. You can unsubscribe at any time via the link in our emails. All emails are from Power Electrics. We promise we will not sell or give away your email address to any third parties. For more details on how we use your information, please see our Privacy Policy.
 

* fields are required


Kennington Tube Station

Sep 13, 2018, 11:01 AM

A bespoke generator and hybrid set up was used to provide temporary power whilst four new customer passageways were being constructed at Kennington Tube Station in South London.

A bespoke generator and hybrid set up was used to provide temporary power whilst four new customer passageways were being constructed at Kennington Tube Station in South London.

The Challenge: 

It is well documented that the air quality in London is well below the standard that should be maintained. New construction sites have a significant impact on air quality, as well as having to manage noise pollution, emissions and any health and safety risks. The challenge on this project was to minimise each potential problem as efficiently as possible. 

Kennington Tube Station sits under an extremely busy road in a concentrated residential area which already emits large amounts of pollutants, so meeting government emissions targets was always going to be a challenge. To further add to the complexity of the issue, there were limitations on space available on site for the temporary power set up. 

The Solution:

To combat all of these specific requirements whilst still providing a time sensitive solution, Power Electrics supplied a super silent 300kVA diesel generator combined with a 195kVA hybrid system using remote management software. The on-board software ensures that the generator is only running when it needs to be, therefore minimising emissions output, noise levels and energy usage through the use of real-time data that is constantly harvested from the generator. 

Picture of Kennington Tube StationDue to the spacing issues on site, the hybrid unit was stacked on top of the generator incorporating a custom built exhaust system, reducing the footprint of the job by 45%.

This project also provided the perfect opportunity to utilise Green D+; a fuel utilising nano technology that can reduce emissions by up to 94% and has a considerably better shelf life than diesel. Green D+ and the higher rate of efficiency it possesses over regular diesel was a huge factor in helping Power Electrics meet the specific requirements for this project. 

Major Project Sales Manager, Austin White commented: "Multifaceted, complex projects like this one always present unique challenges. Prioritising energy usage, noise and emissions whilst also factoring time and spatial constraints that go hand-in-hand with London construction sites was extremely complex and required incredibly detailed project management. I am delighted with my team for delivering a solution that kept costs and energy usage down, minimised emission particulates and didn't disturb local residents."

WANT TO DISCUSS YOUR PROJECT? PLEASE CALL +44 (0)370 850 0858