The generator set - an FG Wilson model housed in a custom built 40ft cube enclosure - was supplied with a day fuel tank and installed on the roof of the business park complex.

Generator with two exhausts

A separate 14,000litre bunded bulk fuel tank was installed in the basement with standby fuel transfer pumps and controls to automatically pump fuel to the day tank on the roof.

Prior to installation, the set was fitted with a GR electrical free issue panel to accept busduct connection in line with client preferences to avoid cabling.

Installation was carried out by Power Electrics team of highly trained engineers and a project manager was appointed to oversee all aspects.